Huawei Smart Modbus at Home: Difference between revisions
Jump to navigation
Jump to search
Created page with "{{TOCright}} == Introduction == There are several methods to create a Smart Home for FusionSolar but Huawei does not make it easy for the private user to do it. * '''Northbound Access''' seems to be the way Huawei thinks. <br>To get the correct access rights is not easy and has to be done by the installer by creating a so called Northbound User. Often only read-only access is given to the private user. * '''Home Assistant''' seems the second best attempt. <br>Needs also..." |
mNo edit summary |
||
| Line 10: | Line 10: | ||
{| class="wikitableharm" | {| class="wikitableharm" | ||
|- | |- | ||
| [[File:SmartPv-Phev-Bat.png| | | [[File:SmartPv-Phev-Bat.png|thumb|750px|Smart Home PV, PHEV, Battery, Shelly and Wallbox]] | ||
| [[File:Huawei SmartPVMS Architecture.png|thumb| | | [[File:Huawei SmartPVMS Architecture.png|thumb|750px|center|Huawei SmartPVMS]] | ||
|} | |} | ||
== Requirements == | |||
The LMA (Local Modbus Access) is only possible after the opening of the Modbus Access on the SDongle of the Inverter by an official Huawei installer. | |||
== Scenario's == | |||
Revision as of 11:17, 4 January 2026
Introduction
There are several methods to create a Smart Home for FusionSolar but Huawei does not make it easy for the private user to do it.
- Northbound Access seems to be the way Huawei thinks.
To get the correct access rights is not easy and has to be done by the installer by creating a so called Northbound User. Often only read-only access is given to the private user. - Home Assistant seems the second best attempt.
Needs also the opening of the Modbus access on the Inverter through the SDongle. The installation needs the so called Green Home Assitant Hardware, an adds an extra layer and therefor also an extra point of failure. - Local Modbus Access is therefore the most straightforward method.
Local script written in PHP with the Modbus library bypassing the Huawei layer.
This page focuses on the third option Local Modbus Access.
Requirements
The LMA (Local Modbus Access) is only possible after the opening of the Modbus Access on the SDongle of the Inverter by an official Huawei installer.

